Local real estate agency system

 

 

The purpose of the individual system analysis and design project is to demonstrate student’s ability to apply the knowledge learned in this course to a realworld project.
Project Deliverables
The project requires students to perform three phases: (a) requirements analysis, (b) system and database design, and (c) a project plan. Note that in the
phase 3, students are required to use the MS Project software for their project schedule.
The deadline for the Individual Project can be found in the schedule section of the class syllabus.
The following layout format covering a title page and all three phases is recommended for the project.
Title page (project name, author, and date)
Phase 1: Requirement analysis
A. Problem definition
B. Issues
C. Objectives
D. Requirements
E. Constraints
F. Descriiption of the proposed system
G. Logical model design
1. Data flow diagrams
• Context diagram
• Diagram 0
o Diagram 1 (Diagram 1 is optional)
• Descriiptions of processes in each diagram
2. Descriiptions of outputs/inputs/performance/security or controls
H. Specific requirements, if any (interface, operational, resource, performance, etc.)
Phase 2: System and database design
A. User interface
Design an overall user interface consisting of screens, commands, controls, and features to enable users to use the system.
1. How data will be input to the system?
• The physical layout for each input
• The input design and procedures
2. How data will be output from the system?
• The physical layout for each output
• The output design and procedures
B. Data design
Develop a plan for data organization, storage, updating, and retrieval.
1. Database design
• Database tables with their attributes should be presented
• Primary key(s) should be identified in each table, if any
• Three steps of normalization should be included.
2. Entity-relationship diagrams
3. Data file storage and access
C. System architecture
Determine the architecture of the system as Web-based interface, client/server architecture, Internet/Intranet interface, network configuration, etc.
Phase 3: Project plan
A list of tasks or activities needed for implementing the proposed system
Estimating completion time and costs
A project schedule for performing those activities (Gantt charts or PERT charts)
Note that there is no other required software package except the MS Project software in this ITEC-630 course. As a result, you are only required to use the
MS Project software to handle the scheduling part of the project and for other parts, you can use any word editing software or any drawing tools software

 

 

Sample Solution

Researched Depression Paper details: Use this link and see the questions below http://www.cc.com/video-clips/h74nmb/the-colbert-report-hamster-study-links-late-night-tv-with-depression. The clip discusses at research project in which hamsters were placed in dim light and then the results were used to indicate that late night television causes depression. Explain the things to consider: What were the validity issues of the research? What are some of the problems with the research? What are some ways to improve the research plan to get more valid results?Researched Depression Paper details: Use this link and see the questions below http://www.cc.com/video-clips/h74nmb/the-colbert-report-hamster-study-links-late-night-tv-with-depression. The clip discusses at research project in which hamsters were placed in dim light and then the results were used to indicate that late night television causes depression. Explain the things to consider: What were the validity issues of the research? What are some of the problems with the research? What are some ways to improve the research plan to get more valid results?

This question has been answered.

Get Answer
WeCreativez WhatsApp Support
Our customer support team is here to answer your questions. Ask us anything!
👋 Hi, Welcome to Compliant Papers.