Fasting blood glucose:

 

 

 

It is necessary for an RN-BSN-prepared nurse to demonstrate an enhanced understanding of the
pathophysiological processes of disease, the clinical manifestations and treatment protocols, and how they
affect clients across the life span.
Evaluate the Health History and Medical Information for Mr. C., presented below.
Based on this information, formulate a conclusion based on your evaluation, and complete the Critical Thinking
Essay assignment, as instructed below.
Health History and Medical Information
Health History
Mr. C., a 32-year-old single male, is seeking information at the outpatient center regarding possible bariatric
surgery for his obesity. He currently works at a catalog telephone center. He reports that he has always been
heavy, even as a small child, gaining approximately 100 pounds in the last 2-3 years. Previous medical
evaluations have not indicated any metabolic diseases, but he says he has sleep apnea and high blood
pressure, which he tries to control by restricting dietary sodium. Mr. C. reports increasing shortness of breath
with activity, swollen ankles, and pruritus over the last 6 months.
Objective Data:
Height: 68 inches; weight 134.5 kg
BP: 172/98, HR 88, RR 26
3+ pitting edema bilateral feet and ankles
Fasting blood glucose: 146 mg/dL
Total cholesterol: 250 mg/dL
Triglycerides: 312 mg/dL
HDL: 30 mg/dL
Serum creatinine 1.8 mg/dL
BUN 32 mg/dl
Critical Thinking Essay
In 750-1,000 words, critically evaluate Mr. C.’s potential diagnosis and intervention(s). Include the following:
Describe the clinical manifestations present in Mr. C.
Describe the potential health risks for obesity that are of concern for Mr. C. Discuss whether bariatric surgery is
an appropriate intervention.
Assess each of Mr. C.’s functional health patterns using the information given. Discuss at least five actual or
potential problems can you identify from the functional health patterns and provide the rationale for each.
(Functional health patterns include health-perception, health-management, nutritional, metabolic, elimination,
activity-exercise, sleep-rest, cognitive-perceptual, self-perception/self-concept, role-relationship,
sexuality/reproductive, coping-stress tolerance.)
Explain the staging of end-stage renal disease (ESRD) and contributing factors to consider.
Consider ESRD prevention and health promotion opportunities. Describe what type of patient education should
be provided to Mr. C. for prevention of future events, health restoration, and avoidance of deterioration of renal
status.
Explain the type of resources available for ESRD patients for nonacute care and the type of multidisciplinary
approach that would be beneficial for these patients. Consider aspects such as devices, transportation, living
conditions, return-to-employment issues.
You are required to cite to a minimum of two sources to complete this assignment. Sources must be published
within the last 5 years and appropriate for the assignment criteria and relevant to nursing practice.
Prepare this assignment according to the guidelines found in the APA Style Guide, located in the Student
Success Center. An abstract is not required

 

Sample Solution

Sprint Planning Meeting focusses on planning the work to be done during a Sprint. Sprint Planning Meeting is typically of duration of of four hours for two weeks sprints and eight hours for one-month Sprints. The Scrum Master needs to ensure that the meeting takes place and that all the required attendees are present and understand the purpose of this meeting. He also moderates the meeting to monitor the sustenance of discussion and closure on time.
Sprint Planning focuses on the following:
• What all tasks need to be and can be delivered in the Sprint Increment?
• How will the work needed for the execution of Sprint be achieved?
The inputs to this meeting are:
• Product Backlog
• Current product Increment
• Projected capacity of the Team during the Sprint
• Past performance of the Team
The Scrum Team first talks/discuss about the the functionalities that can be developed during the Sprint and the Product Owner provides clarifications on the Product Backlog items. Since The team is the best to assess what they can accomplish in the Sprint, they selects the items from the Product Backlog for the Sprint.
The Scrum Team then comes up with a goal called Sprint Goal. It is an objective that provides insight to the Team on why it is building the Product Increment. The Team then decides on building the selected functionality from the backlog into a working product Increment. Sprint Backlog is thus, the Product Backlog items selected for this Sprint plus the plan for delivering them.
Estimation of the work to be done during the sprint is done during sprint planning

This question has been answered.

Get Answer
WeCreativez WhatsApp Support
Our customer support team is here to answer your questions. Ask us anything!
👋 Hi, Welcome to Compliant Papers.