Humanistic psychologist

link to the book: last chapter

http://tcfc.ouc.edu.cn/_upload/article/files/8b/e1/71a40a2941c88d36247d6b339125/bc8850e8-9ad5-479f-abfa-bf15f699f4bf.pdf

first p:

The questions you will need to answer in this paragraph to get full points include:

What is a humanistic psychologist and their views on human development?
Describe what Maslow meant by a self-actualizer. Would you consider yourself a “self-actualizer?” Why or why not? (
How does romanticism, phenomenology, and Universals fit into Humanistic psychology (or not fit in) as described in the text.
second p:

To get full points in this paragraph you will need to:

1) Share with the class what your “simran” is (at least two examples)

2) What does post traumatic growth (PTG) have to do with positive transformation? Remember, Dr. Hatcher even mentioned PTG last week.

3) Describe the stages of transformation, weave in any theories and concepts we covered in this class (e.g. Jung’s archetypes) and share any personal examples of transformation to bring clarity to your own Phoenix Rising Process.

Sample Solution

the base measure of hardware, materials, parts, and working time, which totally are imperative to creation” (Abdul Rahman, Sharif, and Esa, 2013, p.175). As per the extent of this exploration the term ‘creation’ can be supplanted by ‘client returns (process)’. At the end of the day, squander is each non-esteem including (NVA) movement in a procedure. Lean administration standards are centered around recognizing the significant wellsprings of waste, and afterward utilizing strategies to take out waste (Abdulmalek and Rajgopal, 2007). Squander is constantly connected to lean and the objective of lean administration is to make a worth stream wherein all exercises make esteem (Wahab, Mukhtar, and Sulaiman, 2013; Arnheiter and Maleyeff, 2005). Inside the idea of lean, seven sorts of waste have been recognized, that are portrayed from this point forward.

2.3.1. Seven kinds of Waste

1. Overproduction

This type of waste happens when there is made excessively, too soon or ‘in the event that something goes wrong’ (Wahab, Mukhtar, and Sulaiman, 2013). The tasks ought to have been finished however they are not, the outcome is an over-burden of items, made too soon, that have expanded stock (Hicks, 2007).

2. Pausing

The second most significant wellspring of waste is distinguished as pausing and it is of high significance to item and additionally brings stream back. This kind of burn through happens when time isn’t successfully utilized. For example, when items (returns) are not in development, it will impact the lead time. Therefore, seriousness and consumer loyalty will endure (Wahab, Mukhtar, and Sulaiman, 2013). The misuse of holding up can be depicted as lining and interims of inertness in downstream procedures, brought about by postponed upstream procedures (Hicks, 2007). These interims are loaded up with exercises that don’t include esteem, and each non-esteem including action in a procedure is squander.

This question has been answered.

Get Answer